denver style.
snow in april.
cold cold cold!
all of my plans to work out side have been stomped on by mother nature.
the cold rain started on tuesday,
buy wednesday it was slushy rain,
thurday snow appeared,
today is friday and it's still snowing lightly.
this time of year all of the gardeners start asking the age old question -
have you planted yet?
i would be planting some cold weather crops if i was ready in the yard already....
but the snow has stopped my outdoor activities for now.
this makes me more than ever want to put in a sprouting/growing area so i can start seeds in feburary and have my own plants out on mothers day.
the garage is going to be the cheese storage and growning room along with all the other activies i want to do out there.
because of the snow and cold i went thrifting with dad as our afternoon activity.
the thrift stores here are getting pricey!
half of the good thirft stores are closing and moving out of denver into aurora,
or the land is being bought by flipping wal-mart to put up yet another one of the super mega crap complexes!
but i did hit fifty percent off day at the arc on colfax and sheridan.
we went down to the arc on alameda and fed.
this arc at one time i loved to go to but as of now i just get icky vibes from the place (i am waiting for the building to tell me to get out).
so dad and i are having a fine time, dad found me a lovely apple peeler/corer for two dollars.... and then i ventured over to the kitchen electrical crap and i found a nice coffee grinder for three dollars! super!
i hate my grinder it's top never comes off easily anymore and this one is super nice!
then dad and i look around a little more and we start to go to the check out when a man approaches me
he said that he was going to buy the grinder but he'd put it down for a minute -
what?
and he put it down and i picked it up-
does the words tuff tittys mean anything?
is this not bad form?
if you aren't holding on to a desired item and you place on a shelf with similar items is this item then up for grabs and finder keepers looser weeper?
i gave the looser the grinder. i hate that arc!
home project update:
gio's house is almost complete.
bedroom floor done
office floor done
living room floor installed and urethaned twice
pond dug
pond liner installed
flagstone wall started - then the rain put a halt on that
here are a few pictures
gio and the rocks
this is where we bought the stone
this is us hiding from the hail storm that popped up
pond wall
Friday, April 29, 2005
Sunday, April 24, 2005
the latest from the home front.....
sunday.
it's raining.
rain is great to get out here...
today was to be more time in the garden for me....
the raised planter beds i am planning to look like the planter i built over at 1717
this is a photo of the finished planter with beging growth...
gio's house.
almost ready to be checked off the list!!
three out of the four rooms of flooring in!
the living room floor that has to be installed is getting started tomarrow.
dad and gio installed the sink, sink cabinet, and hanging top cabinets on saturday!!!
those industrious men also put in the final pieces on the raised bed planter. and then i fed them well!
what's next you asked??
the pond.
the front fence and gate
the open roof between little house and my house
how much more time you ask until we complete this??? five to six weeks! plus plan the wedding... it's a sinch! not a problem ! i got everything under control!
help!!!
well, i did get sent some angles this week.
rebecca von (a great designer/artist) is going to do our invites! she is so creative!
and trish christianson has graciously given her time to help (make!! ) my dress she too is talented in many ways but espically with dress making!!!
it's raining.
rain is great to get out here...
today was to be more time in the garden for me....
the raised planter beds i am planning to look like the planter i built over at 1717
this is a photo of the finished planter with beging growth...
gio's house.
almost ready to be checked off the list!!
three out of the four rooms of flooring in!
the living room floor that has to be installed is getting started tomarrow.
dad and gio installed the sink, sink cabinet, and hanging top cabinets on saturday!!!
those industrious men also put in the final pieces on the raised bed planter. and then i fed them well!
what's next you asked??
the pond.
the front fence and gate
the open roof between little house and my house
how much more time you ask until we complete this??? five to six weeks! plus plan the wedding... it's a sinch! not a problem ! i got everything under control!
help!!!
well, i did get sent some angles this week.
rebecca von (a great designer/artist) is going to do our invites! she is so creative!
and trish christianson has graciously given her time to help (make!! ) my dress she too is talented in many ways but espically with dress making!!!
Subscribe to:
Posts (Atom)